Our website use cookies to improve and personalize your experience and to display advertisements(if any). Our website may also include cookies from third parties like Google Adsense, Google Analytics, Youtube. By using the website, you consent to the use of cookies. We have updated our Privacy Policy. Please click on the button to check our Privacy Policy.

Increasing lane kilometers causes equal traffic growth and speed reset within five years

Increasing lane kilometers causes equal traffic growth and speed reset within five years
Contents
  1. The 30-second summary: the seven findings that matter
  2. The exactly proportional increase
  3. The two measures that reduce inducement
  4. Why environmental reports do not record it
  5. Why extra capacity does not raise speed
  6. Practical applications for this
  7. Frequently asked questions
  8. What we do not know
  9. References

The study that examined the causal link between highway capacity and traffic volume in US urban areas, using a dynamic panel model and an identification strategy based on the degree of influence each state’s delegation has held on the key transport committees of Congress, found that capacity expansion generates an exactly proportional increase in vehicle traffic, and that this induced traffic returns travel speeds to their pre-expansion levels within roughly five years. And the study that analysed the 545 largest European cities found that, although expanding lane kilometres causes a long-run rise in traffic that does not solve urban congestion, induced demand is considerably smaller in cities that have a congestion charge, and congestion falls when public transport is expanded.

The 30-second summary: the seven findings that matter

Each row names the study and the year. The thing to watch is the elasticity, which is the key figure.

Finding Result Study and year
Traffic generated by capacity expansion Directly proportional Hymel, Transport Policy (2019)
Time to return to the previous speed Five years Hymel (2019)
Elasticity across 103 Chinese cities Roughly 1 Chen and Klaiber, J Environ Econ Manage (2020)
Induced demand with a congestion charge Significantly smaller García-López et al., J Econ Geogr (2020)
Average speed when the network is expanded Fails to increase markedly Anupriya et al., Transp Res Part A (2023)
Environmental reviews of expansion projects Fail to capture the impact Volker et al., Transp Res Rec (2020)
Capacity expansion as a congestion fix Generally inefficient Anupriya et al. (2023)

What you will discover here

  • The metric that transforms intuition into quantification: elasticity.
  • How long it takes for the fresh roadway to become congested once more.

• The two measures that reduce induced demand.

  • Why environmental reports do not record this effect.

The exactly proportional increase

Kent Hymel published in Transport Policy the study that measures the causal relationship across US urban areas. The methodological problem it solves: the relationship between lane kilometres and capacity is simultaneous, because roads get widened where there is more traffic, and that introduces an endogeneity bias that must be corrected before anyone can speak of causation.

The solution: a set of instrumental variables measuring the degree of influence each state’s delegation has held on the key transport committees of the US Congress, instruments that correlate strongly with highway capacity and are plausibly exogenous given how idiosyncratic the legislative process is. The two results: estimates from a dynamic panel model suggest that highway capacity expansion generates an exactly proportional increase in vehicle traffic, and that induced traffic returns travel speeds to their pre-expansion levels within roughly five years.

What the author concludes

His conclusion is explicit about public policy: these findings cast doubt on the effectiveness of widening highways to eliminate congestion, because the speed benefits of new capacity tend to be short-lived.

The figure repeats on another continent with another method. Wei Chen and Allen Klaiber published in the Journal of Environmental Economics and Management the estimate of the causal effect of urban road expansion on vehicle kilometres travelled across 103 Chinese cities, with a novel matching-based instrumental variable strategy, and found that the elasticity with respect to road length is approximately 1, indicating that new urban roads produce a proportional increase in total traffic.

Study What it measured What it found What it cannot establish
Hymel (2019) US urban areas Proportional rise, five years Effects on non-urban roads
Chen and Klaiber (2020) 103 Chinese cities Elasticity of approximately 1 What share is new travel
García-López et al. (2020) 545 European cities Less inducement with charging How much less, exactly
Anupriya et al. (2023) 24 cities worldwide Average speed does not rise Effects outside the measured network
Volker et al. (2020) Five California projects Reviews underestimate the effect Whether it happens elsewhere

The two measures that reduce inducement

Miquel-Àngel García-López, Ilias Pasidis and Elisabet Viladecans-Marsal published in the Journal of Economic Geography the research exploring the moderators of this phenomenon. The study analyses information from the 545 most populous European urban centres to determine whether broader highway networks alleviate gridlock, while isolating traffic growth driven by expanded spatial coverage from that caused by higher carrying capacity. The overarching findings corroborate previous academic literature: over extended periods, and consistent with the fundamental law of highway congestion, increasing lane kilometres within cities triggers a surge in vehicular traffic that ultimately fails to resolve urban gridlock.

And the two results that bring public policy into the equation: induced demand is considerably smaller in cities that have congestion charging schemes, and congestion falls as public transport is expanded.

Coverage and capacity are not the same lever

The distinction drawn by the researchers is crucial regarding which project gets constructed: extending the network into unserved areas and adding lanes to an existing road represent two distinct interventions, and the traffic induced by each follows a different pathway.

That is why their policy reading is not a blanket refusal to build: it is a statement about what the building has to be paired with. A city that widens and prices at the same time is not running the same experiment as a city that only widens, and the European figures say the second one will spend the money and keep the queue.

Why environmental reports do not record it

Jamey Volker, Amy Lee and Susan Handy published in the Transportation Research Record the study that compares the evidence with administrative practice. The diagnosis: the induced traffic effect is ignored, underestimated or badly estimated in the planning process, and in particular in the assessment of the environmental impacts of road capacity expansions, and one main reason is that travel demand models do not usually include all the feedback loops needed to predict it accurately. The consequence of that underestimation: underestimating induced traffic generally leads to overstating the congestion relief benefits an expansion project might deliver, and to understating its environmental impacts.

What they accomplished: they built a web-based utility leveraging elasticities sourced from academic literature to streamline the estimation of traffic triggered by highway expansion initiatives, deployed it across five distinct freeway widening ventures within California, and contrasted the findings against the induced traffic projections featured in those very initiatives environmental impact assessments.

Personalized A.I. Agents Are Here. Is the World Ready for Them?
Study Scope Size Headline figure
Hymel (2019) United States Urban areas, dynamic panel Proportional elasticity
Chen and Klaiber (2020) China 103 cities Elasticity of about 1
García-López et al. (2020) Europe 545 cities Charging and transit moderate
Anupriya et al. (2023) Worldwide 24 cities Average speed unchanged
Volker et al. (2020) California Five widening projects Reviews miss the effect

The result of that comparison

The authors’ conclusion is blunt: their results suggest that environmental analyses frequently fail to fully capture the induced traffic effects of highway capacity expansion projects.

It is a finding about procedure, not about traffic: the evidence exists and is solid, and even so it does not enter the file on which the decision to build is made. The tool they built is the practical answer to that gap, since applying a published elasticity to a project’s own lane kilometres takes an afternoon, while rebuilding a regional travel demand model to include the missing feedback loops takes years.

Why extra capacity does not raise speed

Anupriya, Prateek Bansal, and Daniel Graham released a study in Transportation Research Part A that measures the technology of congestion, meaning how network efficiency shifts depending on usage levels. The approach: a causal statistical modeling technique that adjusts for biases caused by intricate interactions among traffic flow, traffic management, and capacity, implemented across the road networks of 24 global cities. The outcome: expanding network capacity typically fails to serve as an effective remedy for congestion management, given that average travel speeds throughout the network do not experience significant gains when capacity is expanded.

The authors explain why that measurement was hard to obtain: getting empirical estimates of the technology of congestion from traffic data is complicated by the statistical biases that emerge from those interactions.

What the network figure adds to the corridor figure

The contribution of measuring across the network rather than on the widened section is that it closes the usual escape route from the induced demand result: a widened road can indeed carry more vehicles at a reasonable speed while the network as a whole moves no faster, because the queue has been relocated rather than removed.

Read alongside Hymel’s five years, the two studies describe the same outcome from two angles: the corridor returns to its earlier speed over time, and the network never gained speed to begin with. Neither result says the extra capacity carries nobody; both say the time saving that justified it does not survive contact with the travel it creates.

Practical applications for this

• Do not justify a new lane on congestion relief. Hymel (2019) puts the return to the previous speed at about five years.

  • Pair the expansion with charging or public transport. Those are the two measures that moderate inducement in European cities.

• Demand the elasticity in the environmental file. Volker and colleagues (2020) find it is not recorded.

• Separate coverage from capacity. García-López and colleagues (2020) show they are different interventions.

• Evaluate the overall network speed instead of focusing solely on the expanded portion. This is precisely the approach taken by the 24-city study.

Frequently asked questions

Does widening a highway reduce congestion?

In the short term yes, but that argument falls apart. Hymel demonstrated back in 2019 that capacity growth sparks an exactly proportional increase in traffic, with speeds reverting to their baseline within roughly five years.

Does that figure hold outside the United States?

In China as well, Chen and Klaiber observed across 103 cities an elasticity of approximately 1 connecting road length and vehicle kilometres travelled in 2020.

Is there any method to prevent the new lane from becoming congested?

Along with supplementary policies, García-López and co-workers observe that induced demand is noticeably lower in urban areas featuring congestion pricing and that traffic congestion decreases when mass transit networks grow.

‘Wobbly-tooth puberty’: Cognitive milestones for six-year-old children

Is this taken into account when schemes are approved?

Frequently not. Volker and colleagues, in 2020, find that environmental analyses often fail to fully capture induced traffic, which inflates the expected benefits.

Does the network as a whole get faster?

No. Anupriya and colleagues, in 2023, find across 24 cities that average travel speed across the network does not increase substantially when capacity increases.

What we do not know

  • How much induced traffic constitutes newly generated trips versus mere diversion? The overall metric fails to distinguish between them.

• Exactly how much inducement a congestion charge avoids. The direction is measured, not the magnitude.

  • Which elasticity corresponds to each class of road. The estimates cover high-category roads.
  • Whether the five-year horizon holds for other cities. It was estimated across US urban areas.

References

1. Hymel, K. M. If you build it, they will drive: measuring induced demand for vehicle travel in urban areas. Transport Policy, 2019. DOI: 10.1016/j.tranpol.2018.12.006

2. Chen, W. and Klaiber, H. A. Does road expansion induce traffic? An evaluation of vehicle-kilometers traveled in China. Journal of Environmental Economics and Management, 2020. DOI: 10.1016/j.jeem.2020.102387

3. García-López, M.-À., Pasidis, I. and Viladecans-Marsal, E. Congestion in highways when tolls and railroads matter: evidence from European cities. Journal of Economic Geography, 2020. DOI: 10.1093/jeg/lbab025

4. Anupriya, Bansal, P. and Graham, D. J. Congestion in cities: can road capacity expansions provide a solution?. Transportation Research Part A: Policy and Practice, 2023. DOI: 10.1016/j.tra.2023.103726

5. Volker, J. M. B., Lee, A. E. and Handy, S. Induced vehicle travel in the environmental review process. Transportation Research Record, 2020. DOI: 10.1177/0361198120923365

This content is provided for informational purposes solely and does not constitute advice on road planning or environmental assessment. The referenced studies evaluate diverse nations, highway categories, timeframes, and analytical techniques, making them mutually incomparable; furthermore, none of them enables the forecasting of traffic generated by a specific project along a designated corridor.